View originalJust in time for your Monday morning commute, Dane101 brings you a construction update from the WisDOT:
[quote]
Motorists on East Washington Avenue to see reduced traffic lanes at the Yahara River
[Saturday], the Wisconsin Department of Transportation has reduced the number of travel lanes on East Washington Avenue crossing the Yahara River from 4 lanes to 3 lanes due to structural concerns with a portion of the existing bridge. Motorists should expect two lanes of traffic in the inbound direction and one lane in the outbound direction at the Yahara River through the weekend and into the Monday morning commute.
Starting on Monday, the sidewalk will be closed on the Yahara River Bridge. Pedestrians are asked to use Main Street, one block south of East Washington Avenue, to cross the Yahara River. Traffic will be reduced from two lanes inbound to one lane inbound following the Monday morning commute at 8:30 AM. Crews will remove the sidewalk on the south side of the bridge and begin work to temporarily widen the roadway to the south. Two lanes outbound and one lane inbound will be provided for the Monday afternoon commute starting at 3:30 PM.
Due to the lane closures taking place, motorists should expect additional delay when traveling through the construction zone.
The Yahara River Bridge is being completely replaced with the East Washington Avenue Project. The traffic control plan calls for removing and constructing the north half of the new bridge while maintaining traffic on the south half of the bridge (existing bridge). The existing bridge was constructed in 1905, widened in 1939 and widened again in 1950. The traffic control changes being made at this time will move traffic off of the oldest portion of the existing bridge. Cracks in the pavement have developed over the 1905 portion of the bridge. The portion of the existing bridge now carrying traffic will be removed in mid-July when traffic is moved to the north half of the new bridge.
[/quote]



